Testing Transformers used in Switch Mode Power Supplies


Most electrical equipment is powered by a switch mode power supply. Switching the power at high frequency, 25kHz to 250kHz typically, reduces the size and cost of the power supply. One of the key components in a switching power supply is the transformer. The transformer consists of a ferrite core set, two or more coils wound on a coil former or bobbin, lead wires or printed circuit pins, and a clip or some other means of holding everything together. Butler Winding manufactures custom high frequency transformers and tests 100% of them to make sure they meet all design criteria.

Almost all our transformers are tested on a Voltech AT3600 transformer tester which is calibrated yearly. A four wire Kelvin connections is made to make certain that the voltage and current measurements are made as close as possible to the device under test commonly referred to as the DUT, see figure 1. The first test performed on the DUT is either continuity or resistance. Continuity makes sure the DUT is connected correctly and test fixturing or test leads are correct. Resistance testing additionally measures winding resistance which ensures the correct wire gauge has been used.

Figure 1: A Voltech AT3600 automated transformer tester with a 200W, 50kHz ferrite
EE core transformer under test connected with Kelvin flying test leads.
The second test on the DUT is series inductance. This makes sure the correct type of ferrite material has been used and the correct number of turns has been wound on the bobbin. The test conditions this measurement is made at must be carefully selected. The voltage must be chosen so that the resulting magnetic field density within the ferrite core is between 5 – 10 Gauss. The test frequency should be relatively low, like 1kHz – 10kHz, so you are well below the self resonance frequency of the DUT.
Based on their application, some transformers have an intentional air-gap in the ferrite core. It is common to have an air-gap on the center leg of a ferrite E core set to ensure the core does not saturate if it is operated in a unidirectional application like a switching flyback transformer. If the DUT has an air-gap then leakage inductance is commonly measured. This makes sure the gap is the correct size, 0.001” to 0.040” typically, and that the windings are positioned correctly.

Turns ratio testing is performed on the DUT by applying a signal to one winding and measuring the transformed signals on all the other windings. Polarity is also tested to make sure the windings were wound is the correct direction; this is commonly referred to as the transformer dot convention.

Since isolation is often a transformer requirement, HIPOT testing either AC or DC is performed on the DUT. Voltages range from 100V to 5kV. The high voltage is applied across winding to winding or winding to core and the resultant leakage current is measured. A maximum current limit is set commonly 250uA.

Figure 2: EFD15 size test fixture to which facilitates fast transformer testing. The operator inserts the transformer, clamps it down, and pushes one button to test it. A green/red light switch indicates the pass/fail results.

Test fixturing is used for rapid 100% testing of all transformers. Both thru-hole and surface mount transformers are tested. See figure 2 for our recently tooled EFD15 surface mount test fixture. All test data is saved under its part number and manufacturing date. Special tests beyond what was discussed here can be made. Contact Butler winding to discuss further.

Written by Mike Horgan
Engineering and Quality Manager at Butler Winding

16 comments:

  1. Thanks for sharing this information.Really this blog amazing..........transformer testing

    ReplyDelete
  2. I would like to thank you for the efforts you have made in sharing this. I am hoping the same best work from you in the future.

    High Voltage Transformers

    ReplyDelete
  3. Thank you for sharing the knowledge about the transformer testing .This blog contains the information regarding different transformer testing.

    ReplyDelete
  4. Short circuit usually find in the transformer. Firstly you disconnect the power transformer from service. Second thing you disconnect neutral terminal form earth. After that you should check complete transformer for maintenance. This blog also provides more information about transformer testing.
    Transformer Parts Supplier India

    ReplyDelete
  5. Transformers are required to be designed according to the obligatory International standards like IEC, IS, DIN and VDE. They need to fulfill all environmental and climatic requirements, and are highly required to be protected against fire. Thus, transformers need to be tested in various ways to ensure proper functioning and protection against hazards.
    Affordable Toroidal Transformer in India | Best Transformer
    Manufacturer in India

    ReplyDelete
  6. Thanks for sharing nice information about testing process of SMPS. It is so helpful to me. keep sharing.

    SMPS Manufacturing Services from India | PCB Assembly Manufacturer From India

    ReplyDelete
  7. Nice Post! Great information you shared about the testing process transformers. Thanks for sharing.

    Air core inductor manufacturers in India | Aerospace cable harness manufacturer in India

    ReplyDelete
  8. Great Post! Nice Information you shared about how there testing process will do of transformers. It is so helpful to me. keep sharing.

    Power Transformers in India | Transformer Manufacturer in India

    ReplyDelete
  9. Hey Butler,
    Thanks for writing this amazing post about the impacts of testing process of transformers, the post is really informative, i will recommend it my colleagues who are working on the utility of Current Transducers.
    Keep sharing knowledgeable information like this.

    ReplyDelete
  10. Great Article! And valuable information you shared about testing process of SMPS.

    SMPS Transformer Manufacturer in India | Toroidal Transformer in India

    ReplyDelete
  11. Great post that you have shared about testing process of SMPS. It's very useful to me.

    SMPS Transformer Manufacturer in India | Toroidal Transformer in India

    ReplyDelete
  12. Thanks for the detailed breakdown of transformer components and testing! Ensuring reliability at high frequencies is no small task. I imagine using precision tools, like those from Fluke Philippines, makes a big difference in achieving accurate results.

    ReplyDelete